From October 2012, Minks indtalled GRE pipes from DN25 to DN150 for drinking water and and pipes for gray and black water systems on the transformer platform windfarm Riffgat. Minks have also done the plumbing for the kitchen, showers, sinks, toilets and urinals. We also have connected the watermaker from the salt water tank to the (fresh) watersytem.

Besides plastic pipes, we have also welded and installed stainless steel pipes (DN300), the stainless steel fuel lines (DN25) and constructed stainless steel pipes (DN50) to the oil separator tanks. The GRE-pipe we installed at the outside of the platform is traced and insulated.

Transformer platform windfarm DanTysk:
In this summer, the transformer platform for DanTysk wind farm off the coast of Denmark are placed. Minks is currently working on the production of pipes for the suction of the fire extinguishing water. The pumps, hanging on GRE pipes, will be placed 36 meters below the platform. Through a special construction, designed by Minks, the pipes will sink one by one and are attached via a cover on the extinguishing system. In total there are 3 composite pipe mounted.